ProjectMayan TricycleSanta Cruz Build Days Mid June 2012First day at John S's house in Sant Cruz (12.19.19.8.19 5Kawak 2Sek G8 In Mayan) Great first work Day!!!RAH. |
|||
Grassy uneven patch of ground.
|
Placing a solid center post
|
|
|
John pre-made a head/center junction piece.
|
|
Using an old KE transit, John, Gwen (Who shot most of these photos) and wizzard started making a radially oriented platform to build on (why stoop to the ground?) Shortly afer we started Charlie joined us as well. Everyone had a job.
|
|
|
|
John had laid out the platform in Auto-Cad. After placing 19 boards when we went to place the loast board it was off by 1/16' of an inch! Amazing on such a large structure!
|
|
|
Playin'. Doing some not so deep dip between the rails.
|
Higher Vantage point.
|
|
The neighbors were interested.
|
|
|
John at computer with gear teeth in AutoCAD
|
|
Platform done, it's time to make teeth (waitin til monday for thinner wood for big arcs.)
|
Looking out John's kitchen, he can see progress on the platform.
|
Cutting Near the lines on a band saw.
|
|
Charlie drilling 4 holes to make it easier to turn the piece of when in the band saw.
|
John, showing wizzard how to use cutoof saw.
|
|
Do the rest!
|
|
|
John on router doing final shaping (after the band saw got us close.)
|
Charlie took over the band saw. (He was dead set against doing it to start, but took to it FAST!)
|
Laying out 13 teeth on the exact circle we drew on the inner circle of wood pieces. 13 is 1/4th of a circle-our first test to see if the teeth really do fit. Maybe a scosh big??? It's like 6:30 in the evening and there's a beach burn in SC we want to go to and a chance to tell people about it.
|
Tomorow we'll test again with all 52 teeth we need for the smaller rings. If a bit long, we can adjust the size then. We're making 208 of them al togther (stacking 2 thick on each of 2 rings.) Should be a fun day!!
|
|
|
Day 2 - Sunday - of the build days in SC. Elecktra joined us today also.
|
Gwen's turn on the drill press
|
|
Gwen marking gear teeth for cutting.
|
|
|
|
Elecktra screwing the template onto a roughly shaped tooth gives it to John to Route and then unscrews the temple from the completed tooth.
|
|
|
the second batch of 108 teeth blanks for the small wheel.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Accumulating teeth.
|
|
The scrap pile grows.
|
|
Glueing two together to make thicker teeth.
|
|
|
The beginning of gallons of glue to be used.
|